Tier 1 Design Review - EP Subsystem Element

$3,499.00

A fixed-price, quick-turn review of an EP design document — bill of materials, test plan, single-part design with engineering drawing, and more — evaluated by subject matter experts with 15+ years of government & commercial experience against known electric propulsion failure modes, material compatibility requirements, and engineering best practices appropriate to your hardware maturity level. Quickly and efficiently identify material incompatibilities, processing omissions, and design errors that can cost EP development teams tens of thousands of dollars and weeks of schedule. In short, the Tier 1 Design Review catches part-level material and processing errors before they become assembly problems.

The Tier 1 Design Review is applicable for one (1) EP design document (e.g., thruster discharge channel design & drawing, hot-fire test procedure, cathode BOM, etc.); electrical circuit, PWB, or similar design is not covered by this service. Please reach out with questions regarding the scope of your project to confirm you select the correct review tier for your needs.

SUBMISSION REQUIREMENTS

Submissions are scoped for documents of up to 20 pages (written documents) or 100 line items (spreadsheets and BOMs). The submitter is encouraged to provide a clear focus area for the review should a specific set of concerns exist with the submission.

Written documents may be submitted in MS Word (*.DOCX or *.DOC) or PDF formats. Spreadsheets may be submitted in MS Excel (*.XLSX or *.XLS) or PDF formats. No submissions over 25 MB are accepted for this service. Submissions exceeding these limits are accepted at SSI's discretion; additional fees may apply if the scope of review materially exceeds the standard engagement. In these cases, SSI will notify the submitter prior to proceeding with a review.

DELIVERABLE

The results of the thorough review of the submitted design document will be delivered as a formal written report with severity-rated findings and specific corrective recommendations. A 48-h turnaround time after payment & submission of required documents is typical .

TERMS

Scope of Review: This service covers the single submitted document only. Review findings are specific to the materials, components, and information contained within the submission. This service does not include assembly-level or system-level review, procurement assessment, lead time or sourcing analysis, regulatory compliance determination, export control classification, or evaluation of any item not present in the submitted document. The more context provided by the submitter, the more thorough the analysis.

Turnaround Time: SSI targets a 48-hour turnaround from receipt of all required materials, including payment confirmation, executed NDA, and submission document. Turnaround time is a target, not a guarantee, and may be extended in the event of submission complexity, incomplete document submission, or circumstances beyond SSI's control. SSI will notify the submitter promptly if the standard turnaround cannot be met.

Advisory Nature: Findings and recommendations delivered under this service reflect the professional judgment of SSI engineers applied to the submitted materials. They are advisory in nature and do not constitute a guarantee of design adequacy, regulatory compliance, or fitness for any particular purpose. All engineering decisions remain the sole responsibility of the client.

Post-Delivery Follow-Up: SSI may request additional clarification prior to or during the review. One round of written clarifying questions on delivered findings is included and must be submitted within five (5) business days of report delivery. Follow-up is limited to clarification of findings as reported and does not extend the scope of the original review. Additional consulting beyond this scope is available under a separate engagement.

Payment: Payment is due in full at the time of purchase. SSI will not begin review until payment is confirmed and all required materials are received. If submitted materials are determined to be outside the scope of this service, SSI will notify the submitter and issue a refund or offer an alternative engagement as appropriate.

NDA: A fully executed Mutual Non-Disclosure Agreement between the submitter and SpaceProp Strategies, Inc. is required before a review begins. An NDA will be provided upon completion of payment. Submission of materials constitutes the submitter's acknowledgment that they are authorized to share the submitted documents and that all applicable distribution and export control markings are accurate and complete.

A fixed-price, quick-turn review of an EP design document — bill of materials, test plan, single-part design with engineering drawing, and more — evaluated by subject matter experts with 15+ years of government & commercial experience against known electric propulsion failure modes, material compatibility requirements, and engineering best practices appropriate to your hardware maturity level. Quickly and efficiently identify material incompatibilities, processing omissions, and design errors that can cost EP development teams tens of thousands of dollars and weeks of schedule. In short, the Tier 1 Design Review catches part-level material and processing errors before they become assembly problems.

The Tier 1 Design Review is applicable for one (1) EP design document (e.g., thruster discharge channel design & drawing, hot-fire test procedure, cathode BOM, etc.); electrical circuit, PWB, or similar design is not covered by this service. Please reach out with questions regarding the scope of your project to confirm you select the correct review tier for your needs.

SUBMISSION REQUIREMENTS

Submissions are scoped for documents of up to 20 pages (written documents) or 100 line items (spreadsheets and BOMs). The submitter is encouraged to provide a clear focus area for the review should a specific set of concerns exist with the submission.

Written documents may be submitted in MS Word (*.DOCX or *.DOC) or PDF formats. Spreadsheets may be submitted in MS Excel (*.XLSX or *.XLS) or PDF formats. No submissions over 25 MB are accepted for this service. Submissions exceeding these limits are accepted at SSI's discretion; additional fees may apply if the scope of review materially exceeds the standard engagement. In these cases, SSI will notify the submitter prior to proceeding with a review.

DELIVERABLE

The results of the thorough review of the submitted design document will be delivered as a formal written report with severity-rated findings and specific corrective recommendations. A 48-h turnaround time after payment & submission of required documents is typical .

TERMS

Scope of Review: This service covers the single submitted document only. Review findings are specific to the materials, components, and information contained within the submission. This service does not include assembly-level or system-level review, procurement assessment, lead time or sourcing analysis, regulatory compliance determination, export control classification, or evaluation of any item not present in the submitted document. The more context provided by the submitter, the more thorough the analysis.

Turnaround Time: SSI targets a 48-hour turnaround from receipt of all required materials, including payment confirmation, executed NDA, and submission document. Turnaround time is a target, not a guarantee, and may be extended in the event of submission complexity, incomplete document submission, or circumstances beyond SSI's control. SSI will notify the submitter promptly if the standard turnaround cannot be met.

Advisory Nature: Findings and recommendations delivered under this service reflect the professional judgment of SSI engineers applied to the submitted materials. They are advisory in nature and do not constitute a guarantee of design adequacy, regulatory compliance, or fitness for any particular purpose. All engineering decisions remain the sole responsibility of the client.

Post-Delivery Follow-Up: SSI may request additional clarification prior to or during the review. One round of written clarifying questions on delivered findings is included and must be submitted within five (5) business days of report delivery. Follow-up is limited to clarification of findings as reported and does not extend the scope of the original review. Additional consulting beyond this scope is available under a separate engagement.

Payment: Payment is due in full at the time of purchase. SSI will not begin review until payment is confirmed and all required materials are received. If submitted materials are determined to be outside the scope of this service, SSI will notify the submitter and issue a refund or offer an alternative engagement as appropriate.

NDA: A fully executed Mutual Non-Disclosure Agreement between the submitter and SpaceProp Strategies, Inc. is required before a review begins. An NDA will be provided upon completion of payment. Submission of materials constitutes the submitter's acknowledgment that they are authorized to share the submitted documents and that all applicable distribution and export control markings are accurate and complete.